Kazakhstan journal for oil & gas industry, 2023, т. 5, № 1, с. 94-102
Application of simulation to optimize the oil-gathering system of the “N” oil field
Аннотация · Abstract
Background: In the period of 20122021 456 wells were drilled in the western, northern and central sections of the N oil field. The construction of additional wells in the coastal zone (western part) will increase the volume of liquid entering the Group Metering Plant (GMP) -A, which is already operating above designed capacity. Given the above, it was decided to build a new GMP-P on the western section. Aim: The purpose of this work was the need to determine the optimal option for placing the designed GMP-P. Materials and methods: A hydraulic calculation of the Oil Production Shops oil gathering system (OPS) of the N field was carried out by simulating a multi-phase steady flow in a specialized software package with conversion using a geographic information system for reference to the terrain. Results: For the first time, the OPS-1 oil gathering pipeline system of the N field was completely digitized. In the course of the work, 4 options for optimizing the OPS-1 gathering system with different locations for the construction of the GMP-P were considered. Conclusion: Based on the results of the study, option 2 of the GMP-P construction location was selected and justified.
Сведения · Details
- DOI 10.54859/kjogi108599
- Журнал · Journal Kazakhstan journal for oil & gas industry
- Язык · Language английский
- Цитирования (Crossref) · Citations 2
- Лицензия · License creativecommons.org/licenses/by-nc-nd/4.0