Central AsianResearch Index

OPTIMIZATION OF INTRACIRCULAR FLOODING IN DEVELOPMENT ELEMENTS BY INJECTION MODES

In the conditions of the late stage of operation of oil fields, maintaining reservoir pressure through water injection is a key tool for extracting residual reserves. However, excessive injection in overcompensated development elements leads to the formation of man-made cracks (auto hydraulic fracture), an increase in unproductive injection and irrational energy consumption. This paper presents an analytical experience of optimizing injection modes at injection wells of the B-3 cluster pumping station. Based on a comprehensive analysis of hydrodynamic studies of wells – pressure drop curves (efficiency), diagnostic log-log graphs, and Hall graphs – wells operating in the auto hydraulic fracture mode have been identified. For two pilot facilities, injection well, Object B (horizon G-1) and injection well, Object A (horizon G-3), injection pressure was limited by installing fitting devices. The N-10 well has achieved a positive technological effect: the increase in oil production was +2.5 tons/day, and the increase in liquid was +3.3 tons/day. Repeated hydrodynamic studies of wells (GDIS) confirmed the partial closure of the manmade crack and a decrease in unproductive injection. The economic effect of optimizing the reservoir pressure maintenance system is estimated at 29,686.9 thousand tenge per year due to direct energy savings. All calculations and analytical conclusions are performed without the use of specialized software, based solely on analytical methods.

Сведения

Журнал
Neft i gaz
Опубликовано
2026 · Т. 155, № 5, С. 187-202
Язык
Английский
ISSN
1562-2932 · 2708-0080
Издатель
Oil Research and Engineering Center of the National Engineering Academy of the Republic of Kazakhstan
Аффилиации
YESSENOV UNIVERSITY