Central AsianResearch Index

Modernization of the facility and improvement of oil and gas treatment efficiency

The article examines the current oil and gas treatment scheme at the Alibekmola field (Mugalzhar District, Aktobe Region), which includes three-stage separation, thermo-chemical and electro-desalting treatment, degassing in the K-101 column, and subsequent demercaptanization. Based on the description of PPN/CPNG equipment, tank farms, and flare systems, key operational bottlenecks were identified: stability issues of pressure and flow regulators (RD/KR), risks of hydrate formation, reliability of pumping units, heat losses, and hydrocarbon losses through flare systems and vapor equalization lines of tanks. A modernization program was proposed, including thermal-energy integration, digital quality monitoring (online water cut and salt content), optimization of chemical dosing, implementation of variable frequency drives, vapor recovery unit (VRU) and flare gas recovery unit (FGRU) systems, and the expansion of emergency power supply and ESD (PAZ) systems. Expected outcomes include a reduction in specific energy and chemical consumption, minimization of start-stop and flare losses, and an increase in the efficiency and reliability of oil treatment processes.

Сведения

Журнал
Neft i gaz
Опубликовано
2025 · Т. 149, № 5, С. 44-54
Язык
Английский
ISSN
1562-2932 · 2708-0080
Издатель
Oil Research and Engineering Center of the National Engineering Academy of the Republic of Kazakhstan