WELL, RESERVOIR AND FACILITY MANAGEMENT: AS STRATEGY FOR PRODUCTION OPTIMIZATION
This study presents the implementation of a Well, Reservoir, and Facility Management (WRFM) strategy in the mature oil field Field X, located in western Kazakhstan. The main objective of the pilot project was to improve the performance of five representative wells through a structured cycle of surveillance, diagnostics, opportunity identification, execution, and performance review. All interventions were carried out using existing field resources, without capital-intensive operations. The application of WRFM led to a 5–10% increase in oil production relative to baseline, achieved through low-cost measures such as choke adjustments, gas-lift tuning, and reactivation of a previously shut-in well. A key enabler of these results was exception-based surveillance (EBS) and the consistent use of well operating envelopes, which enabled early detection of anomalies and prevented inefficient operation. The project also demonstrated significant organizational improvements: reduced response time from diagnostics to action, enhanced collaboration between engineering and operations, and the development of a continuous improvement culture. The WRFM implementation in Field X confirmed the viability of this approach under the constraints of aging infrastructure and limited investment. The positive results provide a foundation for expanding the WRFM program to additional wells and fields. This study shows that a structured WRFM approach can deliver sustainable production optimization and operational reliability by integrating technical rigor with cross-disciplinary coordination.
Сведения
- Журнал
- Neft i gaz
- Опубликовано
- 2025 · С. 207-220
- Язык
- Английский
- ISSN
- 1562-2932 · 2708-0080
- Издатель
- Oil Research and Engineering Center of the National Engineering Academy of the Republic of Kazakhstan