Influence of the composition of cementing solutions on the quality of well fixing
In the practice of drilling and finishing wells, one of the main tasks of well fastening is to ensure high-quality cementing of casing columns in difficult conditions, including in the presence of abnormally low reservoir pressures (ANPD) in the borehole. To solve this problem, it is proposed to use a combination of cement mortars and couplings for two-stage cementing of wells with the addition of new modifications of chemical reagents to the cement mortar to improve the quality of well cementing, as well as to ensure the height of the cement mortar behind the column to the design. Using new technologies in the process of cementing production columns in a well, in particular, using new modifications of a two percent polymer-based buffer fluid, as well as expanding grouting compounds in the process of fixing wells in ANPD and AVPD conditions. Comparative analyses of the experiments have shown that with the introduction of the proposed technologies and methods, the level of solid cement stone behind the production column has increased from 55-60% to 80-85%. The proposed new type of buffer fluid will have an impact on improving the quality of well anchoring.
Сведения
- Журнал
- Neft i gaz
- Опубликовано
- 2025 · № 2, С. 53-61
- Язык
- Английский
- ISSN
- 1562-2932 · 2708-0080
- Издатель
- Oil Research and Engineering Center of the National Engineering Academy of the Republic of Kazakhstan