IMPROVEMENT OF STRUCTURAL SOLUTIONS FOR THE INTAKE STRUCTURE OF A SMALL HYDROPOWER PLANT ON THE BARSKOON RIVER
The article presents engineering and hydrological solutions aimed at improving the intake structure of a small diversion hydropower plant (HPP) on the Barskoon River (Jeti-Oguz District, Issyk-Kul Region, Kyrgyz Republic). The selection of the intake site is justified based on the optimal hydroenergetic potential of the river section. The project passport is described, detailing the parameters of the main structural elements of the hydraulic unit, which ensure a stable water supply to the pressure diversion system. Key hydromorphometric characteristics of the selected site and specific features of the river’s flow regime are identified. It is established that the annual flow cycle includes three phase-homogeneous periods: snowmelt flood (April–June), snow-glacial flood (July–September), and the autumnwinter low-water period (October–March). Particular attention is given to protection against sediment and frazil ice, as well as ensuring uninterrupted water intake during the winter season. The proposed design solutions are adapted to high-mountain hydrological conditions and are aimed at increasing the reliability of water supply and energy efficiency of small HPPs. The obtained results can be applied in the design of similar hydropower facilities in mountainous regions.
Сведения
- Опубликовано
- 2025 · Т. 25, № 8, С. 160-167
- Язык
- Английский
- ISSN
- 1694-500X · 1694-6839
- Издатель
- State Educational Institution of Higher Vocational Education Kyrgyz-Russian Slavic University