ASSESSMENT OF THE ACTUAL TECHNICAL STATE OF BUILDING STRUCTURES FOR THE POSSIBILITY OF ADDING TWO FLOORS TO AN UNFINISHED BUILDING
In certain cases, there is a need to reconstruct a building, including, if necessary, strengthening some of its structural elements to increase their load-bearing capacity. The decision on the possibility of reconstruction for the purpose of repurposing a building arises only after a technical survey and a feasibility study on the possibility of reconstruction or the advisability of demolishing the building. The article discusses the methodology and results of the survey of the technical condition of the building structures of an existing unfinished two-story building located at the address: Bishkek, Akhunbaev Street – Shakirov Street, (no number). Based on the set of survey works performed, an assessment of the technical condition of this building was given and measures were proposed for the construction of two additional floors, based on the requirements of the current regulatory documents of the Kyrgyz Republic.
Сведения
- Опубликовано
- 2025 · Т. 25, № 4, С. 111-119
- Язык
- Английский
- Цитирований
- 1
- ISSN
- 1694-500X · 1694-6839
- Издатель
- State Educational Institution of Higher Vocational Education Kyrgyz-Russian Slavic University